Project

General

Profile

Actions

Bug #16515

open

Issues with setting start date for sync plan in UI

Added by Brad Buckingham over 7 years ago. Updated almost 6 years ago.

Status:
New
Priority:
Normal
Assignee:
-
Category:
Sync Plans
Target version:
Difficulty:
Triaged:
Fixed in Releases:
Found in Releases:

Description

Cloned from https://bugzilla.redhat.com/show_bug.cgi?id=1372256

Description of problem:

UI field for editing the start date for the sync plan (Content > Sync Plans > Sync plan details tab) has several problems:

1. When clicking edit Start Date, time and time zone is displayed together with the date in Start Date field. Changing time there has no effect after clicking Done -- the Save button is still grayed out, hour/minute "wheel" doesn't change (screenshot 1). After selecting a date from the pop-up calendar, time and timezone information no longer appears in the Start Date Field.

2. When clicking edit Start Date, the hour and minute setter always displays the current time, which is not a problem but it is impossible to save it this way (see screenshot 1 again). The Save button stays gray after changing the time with blue arrows, it only becomes active after changing the date with the pop-up calendar (see screenshot 2).

3. You can input text and click Done without failure (screenshot 3)

Actions #1

Updated by Brad Buckingham over 7 years ago

  • Subject changed from Issues with setting start date for sync plan in UI to Issues with setting start date for sync plan in UI
  • translation missing: en.field_release set to 114
Actions

Also available in: Atom PDF