Project

General

Profile

Actions

Bug #17048

closed

pre-upgrade check script tells to wait even though there are no active tasks

Added by Brad Buckingham over 7 years ago. Updated over 5 years ago.

Status:
Closed
Priority:
Normal
Category:
Upgrades
Target version:
Difficulty:
trivial
Triaged:
Fixed in Releases:
Found in Releases:

Description

Cloned from https://bugzilla.redhat.com/show_bug.cgi?id=1385878

Description of problem:
pre-upgrade check script tells to wait even though there are no active tasks

Version-Release number of selected component (if applicable):
  1. rpm -qa | grep satellite
    satellite-installer-6.2.0.12-1.el7sat.noarch
    tfm-rubygem-foreman_theme_satellite-0.1.28-1.el7sat.noarch
    satellite-cli-6.2.2-1.1.el7sat.noarch
    satellite-6.2.2-1.1.el7sat.noarch

How reproducible:
Always

Steps to Reproduce:
  1. foreman-rake katello:upgrade_check
    This script makes no modifications and can be re-run multiple times for the most up to date results.
    Checking upgradeability...

Checking for running tasks...
[PASS] - There are 0 active tasks.
Please wait for these to complete or cancel them from the Monitor tab.

Actual results:
See above - "Please wait for these to complete or cancel them from the Monitor tab."

Expected results:
The above line should not be printed. Instead, show something like:

"Please proceed with the upgrade"

Actions #1

Updated by Brad Buckingham over 7 years ago

  • Subject changed from pre-upgrade check script tells to wait even though there are no active tasks to pre-upgrade check script tells to wait even though there are no active tasks
  • Assignee set to Brad Buckingham
  • Target version set to 133
  • translation missing: en.field_release set to 197
  • Difficulty set to trivial
Actions #2

Updated by The Foreman Bot over 7 years ago

  • Status changed from New to Ready For Testing
  • Pull request https://github.com/Katello/katello/pull/6407 added
Actions #3

Updated by Brad Buckingham over 7 years ago

  • Status changed from Ready For Testing to Closed
  • % Done changed from 0 to 100
Actions

Also available in: Atom PDF