Project

General

Profile

Actions

Bug #28247

closed

Job details is missing overall result, only percentage is shown

Added by Adam Ruzicka over 4 years ago. Updated over 4 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Category:
-
Target version:
-
Difficulty:
Triaged:
No
Found in Releases:

Description

Cloned from https://bugzilla.redhat.com/show_bug.cgi?id=1771528

Description of problem:
In web UI in job details there isn't overall result inside pie chart. There is only percentage and result (Failed, Succeeded) is missing. Result was there in 6.6 ( see attachments )

Version-Release number of selected component (if applicable):
Sat 6.7 snap 1

How reproducible:
always

Steps to Reproduce:
1. Have some job that already run
2. Navigate to the details page of job

Actual results:
There is only percentage inside of pie chart

Expected results:
There should be overall result below percentage

Additional info:
Looks like this element where result should be (and in 6.6 was) is still there but is empty

Actions #1

Updated by The Foreman Bot over 4 years ago

  • Status changed from New to Ready For Testing
  • Assignee set to Adam Ruzicka
  • Pull request https://github.com/theforeman/foreman_remote_execution/pull/445 added
Actions #2

Updated by The Foreman Bot over 4 years ago

  • Fixed in Releases foreman_remote_execution 2.0.3 added
Actions #3

Updated by Anonymous over 4 years ago

  • Status changed from Ready For Testing to Closed
Actions

Also available in: Atom PDF