Project

General

Profile

0.5.0

closed

100%

16 issues   (16 closed — 0 open)

0.5.0

Sprint Notes

This sprint is composed of two sprints.
The purpose of this sprint it to refactor arf_rpeorts so they are:
  • Proccessed on the smart-proxy
  • Are part of Foreman reports sti

As there are two sprints for the release, issues are prioritized.

Retrospective

What was good?

What was bad?

Actions for next sprint

Issues by
Bug

8/8

Refactor

7/7

Tracker

1/1

Also available in: TXT