h1. Release Management
2 4 Sam Kottler
3 16 Dominic Cleal
For each major (x.0) and minor release there is a release manager who is responsible for making releases happen. This person is responsible for preparing for releases, ensuring stability of the release, ensuring documentation and announcements are made and generally ensuring a high quality is made.
4 17 Dominic Cleal
5 22 Dominic Cleal
This document describes high level tasks, while the [[Release_Process]] document covers specific steps (down to individual commands) that need to be run at each step of the release.
6
7 20 Dominic Cleal
{{toc}}
8
9
h2. Version numbering
10
11
Foreman version numbers are in the form: MAJOR1.MAJOR2.MINOR, with an optional -RC1 suffix for release candidates.
12
13
A "major" release is a new 1.8, 1.9 etc.  A minor release would be 1.8.1.  A release candidate would be 1.8.0-RC1.
14
15
There is no plan for when to increment the first digit of the major version number.  Perhaps if a large enough refactoring is made to Foreman's design, it could be raised on foreman-dev and the number changed.
16
17
h2. Schedule
18
19
The aim is to make a Foreman major release every three months, with around 3-5 minor releases every month thereafter.  In reality this varies between 3-5 months for a major, and 2-6 weeks for a minor.  This is a time-based and not feature-based release strategy, more on that below.
20
21
For each major release, create a new schedule linked from [[Development_Resources]].  Keep this up to date as and when any branching and release dates are known.
22
23
Generally the landmark events for a release "N" are, with example dates:
24
25
# 1st January: Development starts for N, when N-1 is branched
26
#* i.e. commits go to develop branches only
27
# _1st February: N-1 is released, therefore N is released in 3 months' time_
28
# 1st February: branch warning
29
# 1st April: N is branched and N.0-RC1 made
30
# 1st May: N.0 is released
31
# 1st June: N.1 is released
32
33 24 Dominic Cleal
!release_schedule.png!
34
35 20 Dominic Cleal
Clearly there are many release streams running in parallel at any one time.  Unfortunately we don't have an automatic visualisation of this.
36
37
The biggest risks to the schedule order tend to be, a) delays to branch usually caused by requests for specific features, b) elongated release candidate period due to regressions.
38
39
h3. Time-based releases and feature inclusion
40
41
Major releases are only time-based, as the project makes no attempt to produce a roadmap for feature inclusion (such processes can take months).  Simply, whatever is merged at the time of branching are the features that make the release.
42
43
Requests for additional features to be included in the release are common between branching and RC1, but should be considered on a case-by-case basis, preferring to refuse the request.  They have the risk of adding instability to the release, as it can take days or weeks to discover issues caused by the change affecting other components.
44
45
h3. Release candidates
46
47
Typically between two and four release candidates are made, starting from about one week after branching with a spacing of two weeks.  This leads to a typical RC period of between 1-2 months.
48
49
When more than two RCs are required, the schedule will likely have a knock-on effect for the subsequent major release.  Aim to release N+1 three months after N.0 still - so the N release process may be four months, but aim for N+1 to be three months after, rather than two months.
50
51
h3. Minor releases
52
53
Typically between three and five minor releases are made, starting from about 2-3 weeks after the major release and a spacing of around one month between minors.  This leads to an overall lifecycle of about 4-6 months for a single major release.
54
55
The first minor tends to follow the major release quickly, as further regressions are normally found and need to be addressed soon.  Minor releases 2 and 3 tend to continue with regression fixes and may contain general bug fixes found in parallel and that are safe and good to backport.
56
57
Minor releases 4 and 5 usually only happen in response to high severity security issues that can be safely fixed.
58
59
No official EOL date or version is given.
60
61
h2. Issue tracking
62
63
Redmine is the primary issue tracker for Foreman core projects, where all commits to the "big four" (Foreman, proxy, installer, SELinux) must have a corresponding ticket.  This ensures that the release manager can track changes for release notes and backports.
64
65
Every closed ticket should have the "Release" flag set on commit, preferably by the release manager.
66
67
# If it contains a refactoring, set it to the next major release
68
# If it is a new feature, set it to the next major release
69
# If it fixes a regression for something only in develop, set it to the next major release...
70
#* ..though if it was scheduled for an upcoming release but then got moved to a later one, consider moving both back to the upcoming release
71
# If it depends on another ticket or new dependency, set it to the next major release
72
# If it contains a database schema change, set it to the next major release
73 21 Dominic Cleal
# If it contains new strings or changes, set it to the next major release
74 20 Dominic Cleal
# If it is a bug fix that contains no tests, set it to the next major release
75
# If it is a bug fix that contains a behaviour change likely to require some adaption, set it to the next major release
76
# If it is a bug fix that is well-tested and seems low risk, set it to the next minor release
77
# If it is a high severity security fix, set it to the next minor release
78
79
These aren't hard and fast rules, make decisions based on experience.  If in doubt, defer it to the next major release.
80
81
When a regression is found - that is, a negative behaviour change between the last release and the upcoming one:
82
83
# Mark the ticket as related to the ticket that caused the regression
84
# If the change causing it is not in a stable branch yet, set both tickets to the next major release
85
# Set the release flag to the upcoming release
86
87
Any open ticket with a release set is a blocker.
88
89 18 Dominic Cleal
h2. Components
90
91
Some release components are pieces of software that the project will maintain and ship (Foreman core, smart proxy etc), while others may be maintained by third parties.  In order to release, we need to try and ensure as much of this is working correctly with the release as possible.
92
93 19 Dominic Cleal
# "Foreman":https://github.com/theforeman/foreman
94
#* branched and released as part of the release process
95
#* high level of activity, has a reasonably stable develop branch
96
#* blockers tracked in Redmine where "Release = X"
97
# "Smart proxy":https://github.com/theforeman/smart-proxy
98
#* branched and released as part of the release process
99
#* low-medium level of activity, generally has a stable develop branch
100
#* blockers tracked in Redmine's smart-proxy project where "Release = X"
101
# "Foreman SELinux":https://github.com/theforeman/foreman-selinux
102
#* branched and released as part of the release process
103
#* very low level of activity, generally has a stable develop branch
104
#* blockers tracked in Redmine's foreman-selinux project where "Release = X"
105
# "Puppet modules":https://github.com/theforeman/?utf8=%E2%9C%93&query=puppet
106
#* new major/minor releases immediately prior to Foreman releases, patch releases where required
107
#* releases generally made from master or -stable branches when necessary
108
#* low-high levels of activity, generally has a stable master branch
109
#* blockers usually tracked in Redmine's puppet-foreman project where "Release = X"
110
# "Foreman Installer":https://github.com/theforeman/foreman-installer
111
#* branched and released as part of the release process
112
#* composed of Puppet modules above
113
#* very low level of activity itself, generally has a stable develop branch
114
#* blockers tracked in Redmine's puppet-foreman project where "Release = X"
115
# "Debian packaging":https://github.com/theforeman/foreman-packaging/tree/deb/develop
116
#* branched and released as part of the release process
117
#* low-medium level of activity itself, generally has a stable develop branch
118
#* blockers tracked in Redmine's rpms project where "Release = X"
119
# "RPM packaging":https://github.com/theforeman/foreman-packaging/tree/rpm/develop
120
#* branched and released as part of the release process
121
#* medium level of activity itself, generally has a stable develop branch
122
#* blockers tracked in Redmine's rpms project where "Release = X"
123
# "Hammer CLI":https://github.com/theforeman/hammer-cli
124
#* branched and released in parallel to the release process
125
#* medium level of activity itself, generally has a stable develop branch
126
#* blockers tracked in Redmine's hammer-cli project
127
# "Plugins":http://projects.theforeman.org/projects/foreman/wiki/List_of_Plugins
128
#* active and larger plugins tend to be branched and released for new major Foreman versions
129
#* asynchronous release schedules, try to request any compatibility releases are done by the RC1-RC2 timeframe
130
#* blockers tracked in per-project issue trackers, either Redmine or GitHub
131
# "theforeman.org":https://github.com/theforeman/theforeman.org
132
#* copied and updated during the release process
133
#* medium level of activity itself
134
#* blockers tracked in per-release "tickets on GitHub":https://github.com/theforeman/theforeman.org/issues
135
# "Translations":https://www.transifex.com/projects/p/foreman/
136
#* updated during the release process, between branching and the .2 release
137
#* medium level of activity itself
138
#* issues tracked in Transifex per-translation
139 23 Dominic Cleal
#* can only translate one release at a time, usually switches after the .2 release to the next major
140 1 Sam Kottler
141 20 Dominic Cleal
h2. Comments
142 19 Dominic Cleal
143 20 Dominic Cleal
The current release process has been developed over a few years, over half a dozen major releases and many tens of minor releases.  Suggestions for changes are welcome, please propose them to foreman-dev@googlegroups.com.