Project

General

Profile

Actions

Bug #33037

closed

Cancel button should be enabled in the capsule sync until the job completions

Added by Samir Jha over 3 years ago. Updated over 3 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Category:
Foreman Proxy Content
Target version:
Difficulty:
Triaged:
Yes
Fixed in Releases:
Found in Releases:

Description

Cloned from https://bugzilla.redhat.com/show_bug.cgi?id=1878049

Description of problem: Cancel button should be enabled in the capsule sync until the job completions.

Version-Release number of selected component (if applicable):
6.8 Snap14

How reproducible:
always

Steps to Reproduce:
1. Install satellite and Capsule with latest 6.8 Snap.
2. Create custom repo and Add RHEL repo.
3. Create Lifecycle env, Content view and activation key.
4. Go to Infrastructres -->Capsules and click on the one of capsule.
5. Trigger the optimized sync operation.
6. Sync operation is in-progress and "Cancel Sync" option is enabled.
7. After reload the page or change the page, the "Cancel sync" button disappear and "Syncronize" option enable with "Optimized Sync" and "Complete Sync"

Actual results:
Cancel Button disapperar after refreshing the Capsule sync page.

Expected results:
Cancel button for in-progress job should not be disappear until the job completion.

Additional info:
I have attached the recording of this issue

Actions

Also available in: Atom PDF